Controlling Project Performance and Project Closure
Develop a three (3) page paper that addresses the following:
?Illustrate two (2) advantages and two (2) challenges associated with fast tracking and provide examples based on your own experience (not examples from the text)..
?Discuss both what it means and possible causes for a project with a CPI of 1.2 and an SPI of 0.8 (include hypothetical figures for PV, AC, and EV in your discussion)..
?Discuss the benefit of effective project closure using examples to support your answer..
?Recommend two (2) best practices concerning project closure that would apply to almost any project.
The format of the paper is to be as follows:
?Typed, double-spaced, Times New Roman font (size 12), one-inch margins on all sides (APA format)..
?Use headers for each of the subjects being covered, followed by your response..
?In addition to the three(3) pages required, a title page is to be included. The title page is to contain the title of the assignment, your name, the instructor?s name, the course title, and the date.